CPAS · Bollen Office Renovation

 

Enable a local public service to engage effectively in the energy transition

Complete renovation of the building envelope. Energy performance requirements are met by replacing PVC frames with wooden frames, re-insulating the curtain wall, carefully renovating the dormer window and installing solar panels.

We propose a design for the base of the façade in ceramics, with coloured textile sunshades. The ironwork is matched to the frames.

All of this helps to reharmonise the colours and geometry of the historic façades while enhancing energy performance.

 

LOCATION
Laeken, Belgium

SURFACE
800 m²

STATUS
competition won - permit deliverd - preparation of execution

CLIENT
CPAS, Ville de Bruxelles

PHASES

  • First draft to Project completion

TEAM
société simple MNAPSG _ manger.nielsen (MN) architectures parallèles (AP) et sophiegreen (SG)



© MNAPSG

 
Previous
Previous

Oslo Region · Workplace

Next
Next

Goethe Institut · Library