CPAS · Bollen Office Renovation

 

Enable a local public service to engage effectively in the energy transition.

Complete renovation of the building envelope: work on the front and rear façades, adjoining gables and roofs. Energy performance requirements are met by replacing PVC frames with wooden frames, re-insulating the curtain wall, carefully renovating the dormer window and installing solar panels.

We propose a design for the base of the façade in ceramics, with coloured textile sunshades. The ironwork is matched to the frames.

All of this helps to reharmonise the colours and geometry of the historic façades while enhancing energy performance.

 

LOCATION
Laeken, Belgium

SURFACE
800 m²

STATUS
Ongoing
1st place competition

CLIENT
CPAS, Ville de Bruxelles

PHASES

  • First draft to Project completion

  • Design Concept

  • Execution Planning

  • Building works

TEAM
Groupement en société simple MNAPSG
MN - Manger Nielsen Architects srl
AP - Architectures Parallèles srl
SG - Sophiegreen srl



© MNAPSG

 
Previous
Previous

Brulocalis · Office Renovation

Next
Next

CPAS · Wimpelberg Facade Renovation